§ 6-121. Administrative authority.  


Latest version.
  • (a)

    The following specifications shall become the city's code for concrete construction within the city limits. The requirements within this section shall become effective on January 1, 1978.

    (b)

    Individual job specifications shall be followed provided the requirements for concrete construction do not fall below the requirements contained in the following code.

    (c)

    The building official or any personnel authorized by the inspection department shall make inspections.

    (d)

    Inspection requests shall be called in by the party setting the forms.

    (e)

    Notification for inspection requests shall be made twenty-four (24) hours previous to concrete placement. Failure to meet this requirement shall result in prosecution.

    (f)

    Plant inspections, slump checks and cylinder breaks shall be made on a periodic basis. Test cylinders shall be made by the contractor as directed by the building official. Any tests required by the building official shall be at the expense of the contractor. Failure to meet these requirements will be justifiable cause to reject concrete or prosecute any party who violates [this] code.

(Code 1974, § 5-10)