Users shall provide necessary wastewater treatment or flow equalization as required
to comply with this article and shall achieve compliance with all federal categorical
pretreatment standards within the time limitations as specified by the federal pretreatment
regulations. Any facilities required to pretreat wastewater to a level acceptable
to the city manager shall be provided, operated, and maintained at the user's expense.
Detailed plans showing the pretreatment facilities and operating procedures shall
be submitted to the city manager for review, and shall be acceptable to the city manager
before construction of the facility. The review of such plans and operating procedures
will in no way relieve the user from the responsibility of modifying the facility
as necessary to produce an effluent acceptable to the city manager under the provisions
of this article. Any subsequent changes in the pretreatment facilities or method of
operation shall be reported to and be acceptable to the city manager prior to the
user's initiation of the changes.