§ 22-31. Sanitary sewers.  


Latest version.
  • (a)

    Sanitary sewer laterals passing under street surfaces shall be installed prior to placement of pavement.

    (b)

    The plan and profiles for the sanitary sewer system shall be prepared for the entire subdivision, even though it may be constructed in stages. All sanitary sewer plans and profiles and specifications must be approved by the city, the Missouri Department of Natural Resources (D.N.R.), and a construction permit obtained from D.N.R. before construction is started. Elevation on sanitary sewer plans shall refer to N.A.V.D. 1988 datum.

    (c)

    The sanitary sewer system shall be connected to the municipal sewer system.

    (d)

    The minimum size pipe shall be eight (8) inches in diameter, excluding service connections.

    (e)

    Upon completion of the sanitary sewer system installation, a state registered professional engineer shall certify that the sanitary sewer system complies with all the standards required by the city, county, and department of natural resources.

(Ord. No. 11367, 2-1-99)